Gonesse, Saints-Pierre-et-Paul

GONESSE

Building Data for Gonesse, Saints-Pierre-et-Paul

  •  
  • Type: Abbey
  • Affiliation: Benedictine
  •  
  • Region: Ile-de-France
  • Department: Val-d'Oise
  • Coords: 48.987, 2.4474
  •  
  • Surveyed: 1969, 1972-74, 1977, 1980-83, 2003, 2014

Map

Virtual Tour

Timeline and building units for Gonesse, Saints-Pierre-et-Paul A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. 
    	    The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. 
    	    Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. 
    	    Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.
X

A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.

info

gray gray 188
1170
60
1180
gray 156
1210
gray 106
1230
80
1240
gray
1050 1170s 1180s 1210s 1230s 1240s 1250

Phases for Gonesse, Saints-Pierre-et-Paul The building sequence is based on my on-site analysis of the construction history,  
    	    using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications.
    	    The analysis of some of the smaller churches are more approximate than I would like, and need further analysis. 
    	    <p>I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. 
    	    A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign.
    	    One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.
    	    <p>Every phase has been assigned to a decade, so there may be more than one phase in a decade. 
    	    <p>While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. 
    	    This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated. 
    	    <p>Clicking on any of the decade graphics will display all buildings that had work being done during that decade.
X

The building sequence is based on my on-site analysis of the construction history, using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications. The analysis of some of the smaller churches are more approximate than I would like, and need further analysis.

I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign. One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.

Every phase has been assigned to a decade, so there may be more than one phase in a decade.

While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated.

Clicking on any of the decade graphics will display all buildings that had work being done during that decade.

1170

Phase 1 - 1170 [1175] - chapel walls - 128 Units


Choir ambulatory walls, windows and arches over.
1170

Phase 2 - 1170 [1177] - choir (a) - 60 Units


Choir aisle capitals
1180

Phase 3 - 1180 [1185] - choir (g) - 60 Units


Choir gallery
1210

Phase 4 - 1210 - choir (c) - 156 Units


Choir clerestory and rib vaults.
1230

Phase 5 - 1230 [1235] - nave (a) - 106 Units


Nave drum piers and aisles, west portal
1240

Phase 6 - 1240 - nave (t) - 80 Units


Nave triforium.