Bruyères-sur-Oise, Saint-Vivien

BRUYER-O

Building Data for Bruyères-sur-Oise, Saint-Vivien

  •  
  • Type: Parish
  • Affiliation:
  •  
  • Region: Ile-de-France
  • Department: Val-d'Oise
  • Coords: 49.156, 2.3318
  •  
  • Surveyed: 1977, 1980-83, 2003

Map

Virtual Tour

Timeline and building units for Bruyères-sur-Oise, Saint-Vivien A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. 
    	    The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. 
    	    Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. 
    	    Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.
X

A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.

info

gray gray 28
1080
gray 18
1100
38
1110
gray 140
1130
18
1140
gray 13
1170
45
1180
gray 35
1230
gray
1050 1080s 1100s 1110s 1130s 1140s 1170s 1180s 1230s 1250

Phases for Bruyères-sur-Oise, Saint-Vivien The building sequence is based on my on-site analysis of the construction history,  
    	    using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications.
    	    The analysis of some of the smaller churches are more approximate than I would like, and need further analysis. 
    	    <p>I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. 
    	    A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign.
    	    One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.
    	    <p>Every phase has been assigned to a decade, so there may be more than one phase in a decade. 
    	    <p>While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. 
    	    This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated. 
    	    <p>Clicking on any of the decade graphics will display all buildings that had work being done during that decade.
X

The building sequence is based on my on-site analysis of the construction history, using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications. The analysis of some of the smaller churches are more approximate than I would like, and need further analysis.

I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign. One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.

Every phase has been assigned to a decade, so there may be more than one phase in a decade.

While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated.

Clicking on any of the decade graphics will display all buildings that had work being done during that decade.

1080

Phase 1 - 1080 [1083] - tower base - 28 Units


Tower base
1100

Phase 2 - 1100 [1109] - tower I - 18 Units


Tower I
1110

Phase 3 - 1110 [1118] - tower II - 20 Units


Tower II
1110

Phase 4 - 1110 [1119] - tower III - 18 Units


Tower III
1130

Phase 5 - 1130 [1132] - east - 140 Units


East
1140

Phase 6 - 1140 [1144] - north - 18 Units


North
1170

Phase 7 - 1170 [1176] - south - 13 Units


South
1180

Phase 8 - 1180 [1180] - nave piers 1-3 - 45 Units


Nave aisles 1-3
1230

Phase 9 - 1230 - nave piers 4 - 35 Units


Nave arcade 4 and west portalc