Beugneux, Saint-Pierre

BEUGNEUX

Building Data for Beugneux, Saint-Pierre

  •  
  • Type: Abbey
  • Affiliation: Augustinian
  •  
  • Region: Picardie
  • Department: Aisne
  • Coords: 49.223, 3.4147
  •  
  • Surveyed: 1977, 1980-83, 2015

Map

Click and drag to rotate; Roller to zoom; Arrow keys to pan

Virtual Tour

Timeline and building units for Beugneux, Saint-Pierre A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. 
    	    The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. 
    	    Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. 
    	    Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.
X

A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.

info

gray gray 20
1140
gray 56
1160
gray 25
1180
56
1190
gray 22
1230
gray
1050 1140s 1160s 1180s 1190s 1230s 1250

Phases for Beugneux, Saint-Pierre The building sequence is based on my on-site analysis of the construction history,  
    	    using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications.
    	    The analysis of some of the smaller churches are more approximate than I would like, and need further analysis. 
    	    <p>I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. 
    	    A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign.
    	    One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.
    	    <p>Every phase has been assigned to a decade, so there may be more than one phase in a decade. 
    	    <p>While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. 
    	    This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated. 
    	    <p>Clicking on any of the decade graphics will display all buildings that had work being done during that decade.
X

The building sequence is based on my on-site analysis of the construction history, using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications. The analysis of some of the smaller churches are more approximate than I would like, and need further analysis.

I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign. One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.

Every phase has been assigned to a decade, so there may be more than one phase in a decade.

While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated.

Clicking on any of the decade graphics will display all buildings that had work being done during that decade.

Earlier

Phase 1 - Earlier


Apse with crossing and tower room over.
1140

Phase 2 - 1140 - tower II - 20 Units


Upper level of the tower
1160

Phase 3 - 1160 - nave s - 56 Units


Nave-s portal, and probably with it the nave, with arches for aisles in the north
1180

Phase 4 - 1180 - raise interior - 25 Units


Remove old crossing and raise height of room under the tower
1190

Phase 5 - 1190 [1198] - east - 56 Units


East two bay with dado arcade and solid wall to the north
1230

Phase 6 - 1230 [1230] - north - 22 Units


North arm, widening of the arch into the apse
Later

Phase 7 - Later


Largely reconstructed after the war, nave and tower and west wall rebuilt.