Rozay-en-Brie, Notre-Dame-de-la-Nativite
Building Data for Rozay-en-Brie, Notre-Dame-de-la-Nativite
- Type: Parish
- Affiliation:
- Region: Ile-de-France
- Department: Seine-et-Marne
- Coords: 48.683, 2.9560
- Surveyed: 1972-74, 1977, 1980-83, 1992-98, 2015
Capitals for Rozay-en-Brie, Notre-Dame-de-la-Nativite
X
The building sequence is based on my on-site analysis of the construction history,
using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications.
The analysis of some of the smaller churches are more approximate than I would like, and need further analysis.
I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements.
A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign.
One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.
Every phase has been assigned to a decade, so there may be more than one phase in a decade.
While this is certainly imperfect, it will allow us to explore all the data, including costs, across time.
This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated.
Clicking on any of the decade graphics will display all buildings that had work being done during that decade.
The building sequence is based on my on-site analysis of the construction history, using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications. The analysis of some of the smaller churches are more approximate than I would like, and need further analysis.
I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign. One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.
Every phase has been assigned to a decade, so there may be more than one phase in a decade.
While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated.
Clicking on any of the decade graphics will display all buildings that had work being done during that decade.
Phase 1 - 1120s [1120] - tower base
tower base with capitals; vault boss seems later from hole in the centre.
Rationale for dating : Suits SS Master
|
Phase 3 - 1190s - nave n4-7 (a)
nave aisle caps n4-7 where work steps down to west of pier 3 with oculi in earlier campaigns, decision for triforiums made afterwards.
|
Phase 4 - 1200s [1200] - choir (c)
choir clerestory, intended taller wall over windows, but vaults squashed down.
Rationale for dating : ex M1 in "Templatemakers" chart 11
|